Bottom floor bricking almost done. Finally got the slight overhang of beam at the front fixed by engineering. Also lowered the windows in the lounge in the nick of time before the brick layers got in.
Gas central heating and ducts were installed. Electrical wiring done. Mostly right with a few minor mistakes
No comments:
Post a Comment