Pages

Tuesday, 23 June 2015

Cabinets

They are putting in the cabinets. A bit of a hiccup as the kitchen windows do not align with the cabinets. Would have to get some spacers and trim the last cupboard. Stairs has been built as well. Glad I made the classic choice as oppose to the modern one. Not too chunky and good views of the void.





Monday, 8 June 2015

Plastering

There's been a bit of a pause end of lock up stage. Mostly fixing things before plastering. It was a bit frustrating waiting for the tradesman to show up and fix things. Plumber relocated the drainage pipes blocking the air vents in lounge, relocated the pipes blacking the pantry sliding door and fixed the location of taps and gas point in the laundry. Nick the fill in CS fixed all the frame work around the house including the head trimmers of lounge windows, reinforcement of studs. MBR replacement window was installed as well.

The only problem is the electrician not fixing the wall lights heights in the back of the house. I had to stop the plastering around the back sliding door until it is fixed..
The family room. Very sunny spot mid winter. You can see the opening to study and lounge that will be closed with plantation shutters.

From back of house.

Upstairs looking at activity room windows in the far end..

Activity room.

Kitchen with 2 small fixed windows and pantry door

Study and lounge.



More pics to come.